PIC

Installation & Commissioning

Factory-trained engineers, on-site, when you need them.

Mechanical installation, loop checks, calibration, and commissioning — handled by our certified field service team.

PIC-SERV-003

Service Specifications

  • Quality AuditISO 9001 & 17025 Standards
  • Engineering LeadOEM-Certified Engineers
  • DeploymentOn-Site & Workshop Laboratories
  • Response SLA24/7 Emergency Support Available

What We Do

How Installation & Commissioning Works at PIC

PIC's field-service engineers manage end-to-end on-site execution — from instrument hook-up to FAT/SAT documentation and operator training.

Expertise Highlights

Strict Compliance Assurance

Every project conforms fully to international safety, precision, and efficiency regulations.

Calibrated Instruments

Access to state-of-the-art reference standards calibrated at our specialized laboratory facility.

Professional Direct Support

Connect directly with the engineers working on your automation loops without sales layers.

Engineered Workflow

A Structured, Repeatable Approach

We execute our services using a meticulously organized lifecycle to guarantee results that match specifications.

01
Phase 1

Site survey

Cable routing, mounting, environmental checks.

02
Phase 2

Installation

Mechanical, electrical, instrument tubing.

03
Phase 3

Loop checks

I/O verification and pre-commissioning.

04
Phase 4

Commissioning

Live tuning and performance validation.

05
Phase 5

Handover

As-built docs and operator training.

Value Addition

Key Service Benefits

Our engineering excellence is geared toward driving efficiency, mitigating operational risks, and reducing total lifecycle costs.

Certified team

Factory-trained on partner equipment.

Full documentation

FAT/SAT reports, as-built drawings.

Operator training

Knowledge transfer included.

Information Desk

Frequently Asked Questions

Have questions about our installation & commissioning capabilities? Find answers here.

Do you provide civil and structural work for installations?
We focus on electrical and mechanical installation of instruments. We collaborate with civil contractors for structural bases.
What is loop checking?
It is verifying that the signal from the field sensor reaches the PLC/DCS accurately and the controller command actuates the control valve correctly.
Are your field engineers safety certified?
Yes, all site teams are trained in industrial safety, confined space entry, and electrical safety protocols.
Do you handle calibration during commissioning?
Yes, we perform pre-installation verification and final loop tuning under full operating conditions.
What documentation is provided at handover?
You receive as-built wiring diagrams, loop check sheets, calibration certificates, and startup reports.
Can you commission systems designed by other companies?
Yes, provided the engineering documentation (P&ID, wiring drawings, datasheets) is complete and verified.
Let's Collaborate

Schedule a Service Consultation

Ready to optimize your industrial plant operations? Reach out to our technical engineering team for a personalized application review and quotation.