Summit Power — 335 MW Combined-Cycle Plant Instrumentation Retrofit
Power & Energy

Summit Power — 335 MW Combined-Cycle Plant Instrumentation Retrofit

Project Completion

August 2026

01

The Challenge

The plant had ageing pneumatic controls and unreliable emissions monitoring, leading to derating and compliance risk.

02

The Approach

Engineered phased migration to a Siemens PCS 7 platform with new CEMS and APC layer.

03

The Solution

Installed in two outages without impacting baseload. Delivered FAT/SAT and full operator training.

04

The Results

Heat rate improved 4.2%, emissions compliance restored, 0 unplanned trips post commissioning.